Commercial

Commercial

[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_pinnaclecaspers-099.jpg]190Pinnacle Bank - Main Branch
Complete remodel of main level while branch remained open. Required a phased approach with much schedule coordination.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_pinnaclecaspers-124.jpg]190Pinnacle Bank - Main Branch
Complete remodel of main level while branch remained open. Required a phased approach with much schedule coordination.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_pinnaclecaspers-129.jpg]170Pinnacle Bank - Main Branch
Complete remodel of main level while branch remained open. Required a phased approach with much schedule coordination.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_pinnacle-reroof-028.jpg]230Pinnacle Bank
Reroof of existing bank building.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_veterans-memorial-park.jpg]250Veteran's Memorial Park - Beatrice, NE
Unique new park honoring veterans. Included extensive budget work to assist in grant writing. Work included new concrete road, street light, building masonry walls, installing irrigation system, extensive site preparation and fill, landscaping, sidewalks, and colored concrete aggregate stars with borders.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_valentinos-052.jpg]200Valentino's
Complete interior remodel of kitchen, dining, bathrooms, lobby and banquet rooms. All completed in a schedule of only 2 weeks to minimize lost revenue to owner.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_valentinos-048.jpg]190Valentino's
Intensive scope of work: new plumbing, electrical, HVAC, and refrigeration; took walls down to wood studs; all new flooring including carpet, ceramic tile, troweled epoxy floor; built a new vestibule with new aluminum doors; demolished existing ceiling tile and grid and replace; installed foldable walls between banquet rooms.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_pavers-llc-lincoln_ne.jpg]250Pavers, LLC - Waverly, NE
New office building. Turnkey design build project.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_parkview-assisted-living.jpg]270Meadowlark Heights Assisted Living Facility – Deshler, Nebraska
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_blue-valley-behavioral-health-026.jpg]240Blue Valley Behavioral Health - Beatrice, NE
New assisted living facility.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_blue-valley-behavioral-health-023.jpg]170Blue Valley Behavioral Health - Beatrice, NE
New assisted living facility.
[img src=http://www.caspersconstruction.com/wp-content/flagallery/commercial/thumbs/thumbs_blue-valley-behavioral-health-001.jpg]130Blue Valley Behavioral Health - Beatrice, NE
New assisted living facility.

See more pictures in our Industrial Gallery and Pre Engineered Metal Buildings Gallery